Nebraska Hall on Southeast Community College’s (SCC) Milford Campus was originaly constructed in 1922 as a Hospital for the State of Nebraska for Soldiers and Sailors. Then, in 1941, the state legislature created the State Trade School on the campus and converted Roosevelt Hall (later named Nebraska Hall) into a dormitory and cafeteria. Nebraska Hall served as a dormitory for generations until June of 2019. Since Nebraska Hall has played a significant role in the history of the state, Seward County, Milford and the College, SCC chose to repurpose and revitalize the building for future generations.

The project consisted of a complete renovation of the 18,500 SF original building and a 2,400 SF addition to the north. The project focused on keeping the original Architectural design of the exterior and matching the original design style for the interior. The building consists of common space for students on the first floor, including a computer lab, study rooms, and a coffee shop. The second floor consists of personnel offices and a conference room for staff use. The third floor includes additional staff offices and a testing center and conference room for students to use.

The hardest challenge for the project was designing the mechanical, electrical and plumbing systems to fit within the existing structural constraints of the building. To maintain acceptable ceiling heights, the existing structure created bays that limited ductwork, piping, and conduit from running horizontally on each floor. A Variable Refrigerant Flow (VRF) system was selected, which utilized concealed ducted units that only require 8″ to 12″ of ceiling space for the equipment and ductwork. A dedicated outside air system (DOAS) was designed to provide fresh air to the spaces. The DOAS is located in the conditioned attic space which allows the ductwork to travel horizontally, then extend vertically down through the floors to serve the VRF units within that structural bay. Similarly, the plumbing systems were constrained to the strucutral bays having to go up the attic or down below grade to travel horizontally.

The electrical and telecom services were replaced. Special coordination occurred with the college for phasing and location of the new transformer. New high efficient LED lighting is provided throughout with lighting controls that allow for flexible usage of the space and exceeding energy code requirements. Historical replica light fixtures were selected for the lobby and waiting space to match the historical design of the building. A new data room was provided on the lowest level with the pathways strategically located to allow for data cabling to extend.