Broken Bow High School
Broken Bow, NE – K-12 School Project
The renovation and addition to Broken Bow High School, completed in early 2026, represented a comprehensive modernization of the facility’s mechanical, electrical, and plumbing systems, plus additions for a new administration area, commons spaces and Career and Technical Education (CTE).
Mechanically, the project involved major HVAC upgrades throughout the existing spaces, including the addition of new air handling systems or roof top units and the reconfiguration of ductwork to align with updated layouts. The introduction of a new CTE center added a layer of complexity typically seen in light industrial facilities, requiring specialized ventilation systems suchs as welding exhaust, vehicle exhaust removal in automotive bays, and dust collection for shop areas. Science labs and other instructional spaces also required enhanced ventilation rates. Better zone control was provided to classrooms by new Variable Air Volume (VAV) systems and new high efficiency hot water boilers.
From an electrical standpoint, the building’s electrical service was upgraded with new distribution panels and dedicated circuits for high-load equipment such as welders, lifts, and shop tools. Lighting systems throughout the facility were modernized with energy-efficient LED fixtures, improving both performance and energy use, while also supporting specialized needs in classrooms, labs, and performance areas. Additional systems such as audiovisual infrastructure in the auditorium and enhanced power and data distribution in instructional areas further contributed to the project’s electrical scope.
